EVEngine Standard

EVEngine Standard is an entry level project performance reporting system designed for those organizations wishing to trial and evaluate the benefits gained from the introduction of an Earned Value based project control and reporting system.

Features include:

EVPM Reports and Graphs these comprise a range of Earned Value and Earned Schedule reports and graphs including time phased S-curves histograms, and tabular reports covering variance, indices and predictors. When tracking Sell Price/Revenue extends the graphs and reports to profit and loss analysis.  With available units of work (labour) or material usage Earned Value performance analysis and performance reporting can be extended to these units.  

Schedule Tracker Utility utilizes activity and milestone held data for schedule, units of cost and work to create an innovative and easy to read tabular project performance report known in the Engineering, Procurement and Contract (EPCM) business, as the “Buck Sheet”.  No more searching through numerous Gantt Chart pages for selected common progress points, then transcribing the data to a worksheet table. Tracker automates the process to present and easy to read tabular tracking report that combines schedule, and optionally units of cost and work Metrics and Indicators.

Basic Filtering and Rollup Functionality by Cost Control Account, Work and Order Breakdown Structures, and by Resource, allowing insight and understanding to where potential problems exist for timely and corrective action.